Construction of heating tunnel of Elbe River in Germany
发布时间:2021-04-14 点击数:235
The construction of the district heating pipeline tunnel under the Elbe River in Hamburg, Germany has been started on August 9, 2022. The tunnel is 30m underground, 1.16km long and 4.55m in diameter.
The project uses a new climate neutral heating technology. This specially designed tunnel can transport waste heat generated during operation in the industrial zone in the south of Hamburg to residential areas in the north of the city.
After completion, the tunnel will partially replace the coal-fired power plant and natural gas heating in Hamburg. The tunnel and related facilities are planned to be completed during the heating period from 2024 to 2025 in Germany.
The project uses a new climate neutral heating technology. This specially designed tunnel can transport waste heat generated during operation in the industrial zone in the south of Hamburg to residential areas in the north of the city.
After completion, the tunnel will partially replace the coal-fired power plant and natural gas heating in Hamburg. The tunnel and related facilities are planned to be completed during the heating period from 2024 to 2025 in Germany.